{"id":96297,"date":"2025-10-21T17:23:25","date_gmt":"2025-10-21T20:23:25","guid":{"rendered":"https:\/\/murray.adv.br\/?p=96297"},"modified":"2025-10-21T17:23:25","modified_gmt":"2025-10-21T20:23:25","slug":"brazil-blackout-reveals-ongoing-risks-in-national-power-grid","status":"publish","type":"post","link":"https:\/\/murray.adv.br\/en\/brazil-blackout-reveals-ongoing-risks-in-national-power-grid\/","title":{"rendered":"Brazil blackout reveals ongoing risks in national power grid"},"content":{"rendered":"<section class=\"content--header\">\n<div class=\"row content-head non-featured \">\n<div class=\"medium-centered subtitle\">\n<h6 class=\"content-head__subtitle\" style=\"text-align: center\"><em>Fire in Eletrobras substation caused cascading outages across the country and raised reliability concerns<\/em><\/h6>\n<\/div>\n<\/div>\n<div class=\"content__signa-share\">\n<div class=\"content__signature\">\n<div class=\"content-publication-data\">\n<div class=\"content-publication-data__text\">\n<div class=\"content-publication-data__from\"><\/div>\n<p class=\"content-publication-data__updated\">10\/21\/2025 <\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<hr class=\"content__divider \" \/>\n<\/section>\n<div id=\"mc-article-body\" class=\"mc-article-body \">\n<article>\n<div class=\"no-paywall\">\n<div class=\"row medium-uncollapsed content-media content-photo\" data-block-type=\"backstage-photo\" data-block-id=\"0\">\n<div class=\"mc-column content-media__container\" data-image-display=\"normal\">\n<div class=\"content-media-container\" style=\"text-align: center\">\n<figure class=\"content-media__figure\"><img loading=\"lazy\" decoding=\"async\" class=\"content-media__image aligncenter\" src=\"https:\/\/s2-valorinternational.glbimg.com\/MErKSSTDLJArLlePutRMwLXbGFE=\/984x0\/smart\/filters:strip_icc()\/i.s3.glbimg.com\/v1\/AUTH_63b422c2caee4269b8b34177e8876b93\/internal_photos\/bs\/2025\/V\/F\/abXQWVSASgIP9ZS8AV3A\/foto15bra-101-apagao-a4.jpg\" alt=\"Reactor fire in Paran\u00e1 disrupted electricity across Brazil for up to 2.5 hours \u2014 Foto: Divulga\u00e7\u00e3o\/Bombeiros\" width=\"1548\" height=\"906\" \/><figcaption class=\"content-media__description\"><em>Reactor fire in Paran\u00e1 disrupted electricity across Brazil for up to 2.5 hours \u2014 Photo: Divulga\u00e7\u00e3o\/Bombeiros<\/em><\/figcaption><\/figure>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"mc-column mc-side-item__container\" data-block-type=\"ads\" data-block-id=\"1\"><\/div>\n<div class=\"mc-column content-text active-extra-styles \" data-block-type=\"unstyled\" data-block-weight=\"30\" data-block-id=\"2\">\n<p class=\" content-text__container \" data-track-category=\"Link no Texto\" data-track-links=\"\" data-mrf-recirculation=\"Article links\">A fire at a power substation in the southern state of Paran\u00e1 triggered a nationwide blackout in the early hours of Tuesday (14), highlighting structural vulnerabilities in Brazil\u2019s electricity grid.<\/p>\n<\/div>\n<div class=\"wall protected-content\">\n<div class=\"mc-column content-text active-extra-styles \" data-block-type=\"unstyled\" data-block-weight=\"51\" data-block-id=\"3\">\n<p class=\" content-text__container \" data-track-category=\"Link no Texto\" data-track-links=\"\" data-mrf-recirculation=\"Article links\">The incident occurred at a reactor in the Bateias substation operated by Eletrobras, which is part of a 500-kilovolt (kV) high-voltage transmission line. The fire caused the shutdown of about 10 gigawatts (GW) of power. While some regions experienced only brief outages, others were left without electricity for over two hours.<\/p>\n<\/div>\n<div class=\"mc-column content-text active-extra-styles \" data-block-type=\"unstyled\" data-block-weight=\"30\" data-block-id=\"4\">\n<p class=\" content-text__container \" data-track-category=\"Link no Texto\" data-track-links=\"\" data-mrf-recirculation=\"Article links\">President Luiz In\u00e1cio Lula da Silva met with Mines and Energy Minister Alexandre Silveira at the presidential palace just hours after returning from an overseas trip to discuss the incident.<\/p>\n<\/div>\n<div class=\"mc-column content-text active-extra-styles \" data-block-type=\"unstyled\" data-block-weight=\"51\" data-block-id=\"5\">\n<p class=\" content-text__container \" data-track-category=\"Link no Texto\" data-track-links=\"\" data-mrf-recirculation=\"Article links\">The blackout activated the Regional Load Relief Scheme (ERAC), a safety protocol that automatically disconnects parts of the system to prevent broader damage. Authorities downplayed the event and rejected the notion of a systemic crisis. Mr. Silveira called it a one-off infrastructure issue, saying Brazil\u2019s national grid operator, ONS, responded promptly.<\/p>\n<\/div>\n<div class=\"mc-column content-text active-extra-styles \" data-block-type=\"unstyled\" data-block-weight=\"41\" data-block-id=\"7\">\n<p class=\" content-text__container \" data-track-category=\"Link no Texto\" data-track-links=\"\" data-mrf-recirculation=\"Article links\">ONS said the fire severed the connection between the southern grid and the Southeast and Central-West regions, prompting a preventive supply cut across the country in varying degrees. The Ministry of Mines and Energy classified the incident as a \u201csevere contingency.\u201d<\/p>\n<\/div>\n<div class=\"mc-column content-text active-extra-styles \" data-block-type=\"unstyled\" data-block-weight=\"46\" data-block-id=\"8\">\n<p class=\" content-text__container \" data-track-category=\"Link no Texto\" data-track-links=\"\" data-mrf-recirculation=\"Article links\">In a statement, ONS said it began a coordinated response to restore power as soon as the situation was identified. Electricity was reestablished in the North, Northeast, Southeast, and Central-West regions within 90 minutes. Full restoration in the South took about two and a half hours.<\/p>\n<\/div>\n<div class=\"mc-column content-text active-extra-styles \" data-block-type=\"unstyled\" data-block-weight=\"48\" data-block-id=\"9\">\n<p class=\" content-text__container \" data-track-category=\"Link no Texto\" data-track-links=\"\" data-mrf-recirculation=\"Article links\">ONS Director-General Marcio Rea said in the statement that the agency quickly reestablished the system, \u201cdemonstrating the robustness of the National Interconnected System (SIN).\u201d He described the event as a controlled power interruption caused by a \u201cfortuitous incident,\u201d the type of failure that could happen in any country.<\/p>\n<\/div>\n<div class=\"mc-column content-text active-extra-styles \" data-block-type=\"unstyled\" data-block-weight=\"40\" data-block-id=\"10\">\n<p class=\" content-text__container \" data-track-category=\"Link no Texto\" data-track-links=\"\" data-mrf-recirculation=\"Article links\">Eletrobras said the shutdown was triggered by a \u201creactor incident\u201d and that power was restored shortly after. \u201cONS will determine what led to the larger disturbance in the national system. Eletrobras will collaborate in identifying the causes,\u201d the company said.<\/p>\n<\/div>\n<div class=\"mc-column content-text active-extra-styles \" data-block-type=\"unstyled\" data-block-weight=\"2\" data-block-id=\"11\">\n<p class=\" content-text__container \" data-track-category=\"Link no Texto\" data-track-links=\"\" data-mrf-recirculation=\"Article links\"><strong>System resilience<\/strong><\/p>\n<\/div>\n<div class=\"mc-column content-text active-extra-styles \" data-block-type=\"unstyled\" data-block-weight=\"63\" data-block-id=\"12\">\n<p class=\" content-text__container \" data-track-category=\"Link no Texto\" data-track-links=\"\" data-mrf-recirculation=\"Article links\">While experts acknowledged the system\u2019s general robustness, the scale of the outage raised concerns. Luiz Carlos Ciocchi, former ONS director-general, said the blackout was \u201cvery different\u201d from a 2023 incident that did not involve a fire. \u201cThe first question that needs answering is what exactly happened at the substation and why a fire in one component shut down an entire plant,\u201d he said.<\/p>\n<\/div>\n<div class=\"mc-column content-text active-extra-styles \" data-block-type=\"unstyled\" data-block-weight=\"55\" data-block-id=\"14\">\n<p class=\" content-text__container \" data-track-category=\"Link no Texto\" data-track-links=\"\" data-mrf-recirculation=\"Article links\">Mr. Ciocchi added that the automatic protection scheme worked as intended, but further analysis was needed. \u201cSystem security must always be a top priority in the power sector,\u201d he said. He noted that the fire happened during low consumption hours and in a region without high renewable output. \u201cThe key is understanding what went wrong.\u201d<\/p>\n<\/div>\n<div class=\"mc-column content-text active-extra-styles \" data-block-type=\"unstyled\" data-block-weight=\"23\" data-block-id=\"15\">\n<p class=\" content-text__container \" data-track-category=\"Link no Texto\" data-track-links=\"\" data-mrf-recirculation=\"Article links\">Power systems engineer Celso Torino pointed out that the 10GW outage was almost equivalent to power plant Itaipu\u2019s capacity of 14 GW.<\/p>\n<\/div>\n<div class=\"mc-column content-text active-extra-styles \" data-block-type=\"unstyled\" data-block-weight=\"66\" data-block-id=\"16\">\n<p class=\" content-text__container \" data-track-category=\"Link no Texto\" data-track-links=\"\" data-mrf-recirculation=\"Article links\">\u201cWe need to better understand why a reactor fire at a 500kV substation caused the complete shutdown of 750kV lines connecting Itaipu\u2019s 60-hertz output to Southeast Brazil,\u201d said Mr. Torino, a former Itaipu operations director. \u201cThe N-1 security criterion tells us this shouldn\u2019t happen.\u201d He referred to the N-1 standard, which requires the grid to withstand the loss of a key component without triggering cascading failures.<\/p>\n<\/div>\n<div class=\"mc-column content-text active-extra-styles \" data-block-type=\"unstyled\" data-block-weight=\"23\" data-block-id=\"17\">\n<p class=\" content-text__container \" data-track-category=\"Link no Texto\" data-track-links=\"\" data-mrf-recirculation=\"Article links\">Mr. Torino said the episode calls for a broader governance review of the national grid, including planning, operational stability, and consumer cost structures.<\/p>\n<\/div>\n<div class=\"mc-column content-text active-extra-styles \" data-block-type=\"unstyled\" data-block-weight=\"36\" data-block-id=\"18\">\n<p class=\" content-text__container \" data-track-category=\"Link no Texto\" data-track-links=\"\" data-mrf-recirculation=\"Article links\">Carlos Adolfo Pereira, who heads the transmission division at the Brazilian Infrastructure and Basic Industry Association (ABDIB), said it was too soon to conclude there was a substation failure and a more detailed assessment was needed.<\/p>\n<\/div>\n<div class=\"mc-column content-text active-extra-styles \" data-block-type=\"unstyled\" data-block-weight=\"33\" data-block-id=\"19\">\n<p class=\" content-text__container \" data-track-category=\"Link no Texto\" data-track-links=\"\" data-mrf-recirculation=\"Article links\">He noted that the industry has been investing in modernizing transmission systems, especially replacing outdated equipment. \u201cTransmission companies are expected to invest about R$40 billion through 2034 to upgrade old infrastructure,\u201d he said.<\/p>\n<\/div>\n<div class=\"mc-column content-text active-extra-styles \" data-block-type=\"unstyled\" data-block-weight=\"2\" data-block-id=\"20\">\n<p class=\" content-text__container \" data-track-category=\"Link no Texto\" data-track-links=\"\" data-mrf-recirculation=\"Article links\"><strong>\u201cReliability issue\u201d<\/strong><\/p>\n<\/div>\n<div class=\"mc-column content-text active-extra-styles \" data-block-type=\"unstyled\" data-block-weight=\"44\" data-block-id=\"21\">\n<p class=\" content-text__container \" data-track-category=\"Link no Texto\" data-track-links=\"\" data-mrf-recirculation=\"Article links\">Edvaldo Santana, former director at energy regulator ANEEL and a columnist for Valor, said the blackout was one of the most significant in recent memory. The August 2023 outage cut 22.5GW of supply, while a 2010 failure involving Itaipu lines knocked out about 11GW.<\/p>\n<\/div>\n<div class=\"mc-column content-text active-extra-styles \" data-block-type=\"unstyled\" data-block-weight=\"47\" data-block-id=\"22\">\n<p class=\" content-text__container \" data-track-category=\"Link no Texto\" data-track-links=\"\" data-mrf-recirculation=\"Article links\">Mr. Santana questioned how a fire in a single reactor\u2014typically considered a minor contingency\u2014could affect the entire country, especially during low demand at around 12:30 a.m. \u201cEven for a critical substation, a reactor fire should have been contained locally. This is a serious reliability issue,\u201d he said.<\/p>\n<\/div>\n<div class=\"mc-column content-text active-extra-styles \" data-block-type=\"unstyled\" data-block-weight=\"36\" data-block-id=\"24\">\n<p class=\" content-text__container \" data-track-category=\"Link no Texto\" data-track-links=\"\" data-mrf-recirculation=\"Article links\">Industry sources described the Bateias substation as strategically important, part of a high-capacity 500kV line, but said it should have withstood the failure. The widespread impact indicates the system is \u201csensitive\u201d to minor incidents, they said.<\/p>\n<\/div>\n<div class=\"mc-column content-text active-extra-styles \" data-block-type=\"unstyled\" data-block-weight=\"54\" data-block-id=\"25\">\n<p class=\" content-text__container \" data-track-category=\"Link no Texto\" data-track-links=\"\" data-mrf-recirculation=\"Article links\">Experts warned the event reinforces a troubling conclusion: Brazil\u2019s grid remains \u201con a knife\u2019s edge,\u201d not due to energy shortages but because of a combination of structural weaknesses. These include fragile transmission infrastructure, equipment failures, excessive daytime solar generation followed by steep nighttime demand ramps, and networks that remain ill-equipped for extreme weather events.<\/p>\n<\/div>\n<div class=\"mc-column content-text active-extra-styles \" data-block-type=\"unstyled\" data-block-weight=\"5\" data-block-id=\"26\">\n<p class=\" content-text__container \" data-track-category=\"Link no Texto\" data-track-links=\"\" data-mrf-recirculation=\"Article links\"><strong>Repeat of a known pattern<\/strong><\/p>\n<\/div>\n<div class=\"mc-column content-text active-extra-styles \" data-block-type=\"unstyled\" data-block-weight=\"39\" data-block-id=\"27\">\n<p class=\" content-text__container \" data-track-category=\"Link no Texto\" data-track-links=\"\" data-mrf-recirculation=\"Article links\">The event echoed a familiar pattern seen since the August 15, 2023 blackout. An ONS report blamed that outage on voltage control failures in wind and solar farms. Since then, the operator has adopted a more conservative management approach.<\/p>\n<\/div>\n<div class=\"mc-column content-text active-extra-styles \" data-block-type=\"unstyled\" data-block-weight=\"44\" data-block-id=\"28\">\n<p class=\" content-text__container \" data-track-category=\"Link no Texto\" data-track-links=\"\" data-mrf-recirculation=\"Article links\">Still, Brazil has experienced at least five major blackouts since then. Even minor incidents have had an impact. In August last year, a short circuit at an Eletrobras substation caused by a stray kite left 942,000 households without power in S\u00e3o Paulo and Guarulhos.<\/p>\n<\/div>\n<div class=\"mc-column content-text active-extra-styles \" data-block-type=\"unstyled\" data-block-weight=\"42\" data-block-id=\"29\">\n<p class=\" content-text__container \" data-track-category=\"Link no Texto\" data-track-links=\"\" data-mrf-recirculation=\"Article links\">Heavy rains also knocked down transmission lines and damaged dams in Rio Grande do Sul, while storms cut power to millions in the S\u00e3o Paulo metro area. In both cases, authorities struggled to respond quickly, leaving consumers in the dark for days.<\/p>\n<\/div>\n<div class=\"mc-column content-text active-extra-styles \" data-block-type=\"unstyled\" data-block-weight=\"18\" data-block-id=\"30\">\n<p class=\" content-text__container \" data-track-category=\"Link no Texto\" data-track-links=\"\" data-mrf-recirculation=\"Article links\">Specialists advocate for capacity auctions and technologies such as batteries and reversible power plants to improve grid resilience.<\/p>\n<\/div>\n<div class=\"mc-column content-text active-extra-styles \" data-block-type=\"unstyled\" data-block-weight=\"49\" data-block-id=\"31\">\n<p class=\" content-text__container \" data-track-category=\"Link no Texto\" data-track-links=\"\" data-mrf-recirculation=\"Article links\">\u201cUntil 2021, utilities invested R$18 billion a year. By 2025, that number will rise to R$46 billion. From 2025 to 2029, we expect R$235 billion in total investments, with 40% focused on modernizing networks,\u201d said Ricardo Brand\u00e3o, executive director for regulation at the Brazilian Association of Electricity Distributors (ABRADEE).<\/p>\n<\/div>\n<div class=\"mc-column content-text active-extra-styles \" data-block-type=\"unstyled\" data-block-weight=\"58\" data-block-id=\"32\">\n<p class=\" content-text__container \" data-track-category=\"Link no Texto\" data-track-links=\"\" data-mrf-recirculation=\"Article links\">The blackout comes just as Brazil prepares to transition from the dry season to the rainy period, which starts in November. There is still uncertainty over rainfall patterns and the recovery of hydropower reservoirs. Operational challenges are compounded by the rapid growth of renewables and pricing distortions that create additional costs for consumers and threaten the sector\u2019s balance.<\/p>\n<\/div>\n<div class=\"mc-column content-text active-extra-styles \" data-block-type=\"unstyled\" data-block-weight=\"60\" data-block-id=\"34\">\n<p class=\" content-text__container \" data-track-category=\"Link no Texto\" data-track-links=\"\" data-mrf-recirculation=\"Article links\">Brazil narrowly avoided two national blackouts this year, one in April and another on Father\u2019s Day, August 10. With low daytime demand, rooftop and small-scale solar generation surged to record levels, forcing ONS to disconnect large wind and solar parks to avoid overloads. Such incidents occur when the grid lacks infrastructure to carry excess generation, or when supply outpaces demand.<\/p>\n<\/div>\n<div data-track-category=\"multicontent\" data-track-action=\"ultimo chunk conteudo\" data-track-noninteraction=\"false\" data-track-scroll=\"view\">\n<div class=\"mc-column content-text active-extra-styles \" data-block-type=\"unstyled\" data-block-weight=\"6\" data-block-id=\"35\">\n<p class=\" content-text__container \" data-track-category=\"Link no Texto\" data-track-links=\"\" data-mrf-recirculation=\"Article links\">(<em>Renan Truffi contributed reporting from Bras\u00edlia.<\/em>)<\/p>\n<p data-track-category=\"Link no Texto\" data-track-links=\"\" data-mrf-recirculation=\"Article links\">*By\u00a0Marlla Sabino,\u00a0F\u00e1bio Couto\u00a0and\u00a0Robson Rodrigues\u00a0\u2014 Bras\u00edlia, Rio de Janeiro, and S\u00e3o Paulo<\/p>\n<p data-track-category=\"Link no Texto\" data-track-links=\"\" data-mrf-recirculation=\"Article links\">Source: Valor International<\/p>\n<p>https:\/\/valorinternational.globo.com\/<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/article>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Fire in Eletrobras substation caused cascading outages across the country and raised reliability concerns 10\/21\/2025 Reactor fire in Paran\u00e1 disrupted electricity across Brazil for up to 2.5 hours \u2014 Photo: Divulga\u00e7\u00e3o\/Bombeiros A fire at a power substation in the southern state of Paran\u00e1 triggered a nationwide blackout in the early hours of Tuesday (14), highlighting [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[8106],"tags":[26532,26533],"class_list":["post-96297","post","type-post","status-publish","format-standard","hentry","category-murray-news","tag-brazil-blackout","tag-risks-in-national-power-grid"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Brazil blackout reveals ongoing risks in national power grid - Murray Advogados<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/murray.adv.br\/en\/brazil-blackout-reveals-ongoing-risks-in-national-power-grid\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Brazil blackout reveals ongoing risks in national power grid - Murray Advogados\" \/>\n<meta property=\"og:description\" content=\"Fire in Eletrobras substation caused cascading outages across the country and raised reliability concerns 10\/21\/2025 Reactor fire in Paran\u00e1 disrupted electricity across Brazil for up to 2.5 hours \u2014 Photo: Divulga\u00e7\u00e3o\/Bombeiros A fire at a power substation in the southern state of Paran\u00e1 triggered a nationwide blackout in the early hours of Tuesday (14), highlighting [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/murray.adv.br\/en\/brazil-blackout-reveals-ongoing-risks-in-national-power-grid\/\" \/>\n<meta property=\"og:site_name\" content=\"Murray Advogados\" \/>\n<meta property=\"article:published_time\" content=\"2025-10-21T20:23:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/s2-valorinternational.glbimg.com\/MErKSSTDLJArLlePutRMwLXbGFE=\/984x0\/smart\/filters:strip_icc()\/i.s3.glbimg.com\/v1\/AUTH_63b422c2caee4269b8b34177e8876b93\/internal_photos\/bs\/2025\/V\/F\/abXQWVSASgIP9ZS8AV3A\/foto15bra-101-apagao-a4.jpg\" \/>\n<meta name=\"author\" content=\"Gelcy Bueno\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Gelcy Bueno\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"7 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/murray.adv.br\/en\/brazil-blackout-reveals-ongoing-risks-in-national-power-grid\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/murray.adv.br\/en\/brazil-blackout-reveals-ongoing-risks-in-national-power-grid\/\"},\"author\":{\"name\":\"Gelcy Bueno\",\"@id\":\"https:\/\/murray.adv.br\/en\/#\/schema\/person\/dd0d0bea46c2436124555d18c1a0d52e\"},\"headline\":\"Brazil blackout reveals ongoing risks in national power grid\",\"datePublished\":\"2025-10-21T20:23:25+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/murray.adv.br\/en\/brazil-blackout-reveals-ongoing-risks-in-national-power-grid\/\"},\"wordCount\":1205,\"image\":{\"@id\":\"https:\/\/murray.adv.br\/en\/brazil-blackout-reveals-ongoing-risks-in-national-power-grid\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/s2-valorinternational.glbimg.com\/MErKSSTDLJArLlePutRMwLXbGFE=\/984x0\/smart\/filters:strip_icc()\/i.s3.glbimg.com\/v1\/AUTH_63b422c2caee4269b8b34177e8876b93\/internal_photos\/bs\/2025\/V\/F\/abXQWVSASgIP9ZS8AV3A\/foto15bra-101-apagao-a4.jpg\",\"keywords\":[\"Brazil blackout\",\"risks in national power grid\"],\"articleSection\":[\"Murray News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/murray.adv.br\/en\/brazil-blackout-reveals-ongoing-risks-in-national-power-grid\/\",\"url\":\"https:\/\/murray.adv.br\/en\/brazil-blackout-reveals-ongoing-risks-in-national-power-grid\/\",\"name\":\"Brazil blackout reveals ongoing risks in national power grid - Murray Advogados\",\"isPartOf\":{\"@id\":\"https:\/\/murray.adv.br\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/murray.adv.br\/en\/brazil-blackout-reveals-ongoing-risks-in-national-power-grid\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/murray.adv.br\/en\/brazil-blackout-reveals-ongoing-risks-in-national-power-grid\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/s2-valorinternational.glbimg.com\/MErKSSTDLJArLlePutRMwLXbGFE=\/984x0\/smart\/filters:strip_icc()\/i.s3.glbimg.com\/v1\/AUTH_63b422c2caee4269b8b34177e8876b93\/internal_photos\/bs\/2025\/V\/F\/abXQWVSASgIP9ZS8AV3A\/foto15bra-101-apagao-a4.jpg\",\"datePublished\":\"2025-10-21T20:23:25+00:00\",\"author\":{\"@id\":\"https:\/\/murray.adv.br\/en\/#\/schema\/person\/dd0d0bea46c2436124555d18c1a0d52e\"},\"breadcrumb\":{\"@id\":\"https:\/\/murray.adv.br\/en\/brazil-blackout-reveals-ongoing-risks-in-national-power-grid\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/murray.adv.br\/en\/brazil-blackout-reveals-ongoing-risks-in-national-power-grid\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/murray.adv.br\/en\/brazil-blackout-reveals-ongoing-risks-in-national-power-grid\/#primaryimage\",\"url\":\"https:\/\/s2-valorinternational.glbimg.com\/MErKSSTDLJArLlePutRMwLXbGFE=\/984x0\/smart\/filters:strip_icc()\/i.s3.glbimg.com\/v1\/AUTH_63b422c2caee4269b8b34177e8876b93\/internal_photos\/bs\/2025\/V\/F\/abXQWVSASgIP9ZS8AV3A\/foto15bra-101-apagao-a4.jpg\",\"contentUrl\":\"https:\/\/s2-valorinternational.glbimg.com\/MErKSSTDLJArLlePutRMwLXbGFE=\/984x0\/smart\/filters:strip_icc()\/i.s3.glbimg.com\/v1\/AUTH_63b422c2caee4269b8b34177e8876b93\/internal_photos\/bs\/2025\/V\/F\/abXQWVSASgIP9ZS8AV3A\/foto15bra-101-apagao-a4.jpg\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/murray.adv.br\/en\/brazil-blackout-reveals-ongoing-risks-in-national-power-grid\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"In\u00edcio\",\"item\":\"https:\/\/murray.adv.br\/en\/home\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Brazil blackout reveals ongoing risks in national power grid\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/murray.adv.br\/en\/#website\",\"url\":\"https:\/\/murray.adv.br\/en\/\",\"name\":\"Murray Advogados\",\"description\":\"PLG International Lawyers\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/murray.adv.br\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/murray.adv.br\/en\/#\/schema\/person\/dd0d0bea46c2436124555d18c1a0d52e\",\"name\":\"Gelcy Bueno\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/murray.adv.br\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/1ef2acfe966d6deacdeccd2a24ea89192c41fd05fc60e57b79021358a47f5641?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/1ef2acfe966d6deacdeccd2a24ea89192c41fd05fc60e57b79021358a47f5641?s=96&d=mm&r=g\",\"caption\":\"Gelcy Bueno\"},\"url\":\"https:\/\/murray.adv.br\/en\/author\/news\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Brazil blackout reveals ongoing risks in national power grid - Murray Advogados","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/murray.adv.br\/en\/brazil-blackout-reveals-ongoing-risks-in-national-power-grid\/","og_locale":"en_US","og_type":"article","og_title":"Brazil blackout reveals ongoing risks in national power grid - Murray Advogados","og_description":"Fire in Eletrobras substation caused cascading outages across the country and raised reliability concerns 10\/21\/2025 Reactor fire in Paran\u00e1 disrupted electricity across Brazil for up to 2.5 hours \u2014 Photo: Divulga\u00e7\u00e3o\/Bombeiros A fire at a power substation in the southern state of Paran\u00e1 triggered a nationwide blackout in the early hours of Tuesday (14), highlighting [&hellip;]","og_url":"https:\/\/murray.adv.br\/en\/brazil-blackout-reveals-ongoing-risks-in-national-power-grid\/","og_site_name":"Murray Advogados","article_published_time":"2025-10-21T20:23:25+00:00","og_image":[{"url":"https:\/\/s2-valorinternational.glbimg.com\/MErKSSTDLJArLlePutRMwLXbGFE=\/984x0\/smart\/filters:strip_icc()\/i.s3.glbimg.com\/v1\/AUTH_63b422c2caee4269b8b34177e8876b93\/internal_photos\/bs\/2025\/V\/F\/abXQWVSASgIP9ZS8AV3A\/foto15bra-101-apagao-a4.jpg","type":"","width":"","height":""}],"author":"Gelcy Bueno","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Gelcy Bueno","Est. reading time":"7 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/murray.adv.br\/en\/brazil-blackout-reveals-ongoing-risks-in-national-power-grid\/#article","isPartOf":{"@id":"https:\/\/murray.adv.br\/en\/brazil-blackout-reveals-ongoing-risks-in-national-power-grid\/"},"author":{"name":"Gelcy Bueno","@id":"https:\/\/murray.adv.br\/en\/#\/schema\/person\/dd0d0bea46c2436124555d18c1a0d52e"},"headline":"Brazil blackout reveals ongoing risks in national power grid","datePublished":"2025-10-21T20:23:25+00:00","mainEntityOfPage":{"@id":"https:\/\/murray.adv.br\/en\/brazil-blackout-reveals-ongoing-risks-in-national-power-grid\/"},"wordCount":1205,"image":{"@id":"https:\/\/murray.adv.br\/en\/brazil-blackout-reveals-ongoing-risks-in-national-power-grid\/#primaryimage"},"thumbnailUrl":"https:\/\/s2-valorinternational.glbimg.com\/MErKSSTDLJArLlePutRMwLXbGFE=\/984x0\/smart\/filters:strip_icc()\/i.s3.glbimg.com\/v1\/AUTH_63b422c2caee4269b8b34177e8876b93\/internal_photos\/bs\/2025\/V\/F\/abXQWVSASgIP9ZS8AV3A\/foto15bra-101-apagao-a4.jpg","keywords":["Brazil blackout","risks in national power grid"],"articleSection":["Murray News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/murray.adv.br\/en\/brazil-blackout-reveals-ongoing-risks-in-national-power-grid\/","url":"https:\/\/murray.adv.br\/en\/brazil-blackout-reveals-ongoing-risks-in-national-power-grid\/","name":"Brazil blackout reveals ongoing risks in national power grid - Murray Advogados","isPartOf":{"@id":"https:\/\/murray.adv.br\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/murray.adv.br\/en\/brazil-blackout-reveals-ongoing-risks-in-national-power-grid\/#primaryimage"},"image":{"@id":"https:\/\/murray.adv.br\/en\/brazil-blackout-reveals-ongoing-risks-in-national-power-grid\/#primaryimage"},"thumbnailUrl":"https:\/\/s2-valorinternational.glbimg.com\/MErKSSTDLJArLlePutRMwLXbGFE=\/984x0\/smart\/filters:strip_icc()\/i.s3.glbimg.com\/v1\/AUTH_63b422c2caee4269b8b34177e8876b93\/internal_photos\/bs\/2025\/V\/F\/abXQWVSASgIP9ZS8AV3A\/foto15bra-101-apagao-a4.jpg","datePublished":"2025-10-21T20:23:25+00:00","author":{"@id":"https:\/\/murray.adv.br\/en\/#\/schema\/person\/dd0d0bea46c2436124555d18c1a0d52e"},"breadcrumb":{"@id":"https:\/\/murray.adv.br\/en\/brazil-blackout-reveals-ongoing-risks-in-national-power-grid\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/murray.adv.br\/en\/brazil-blackout-reveals-ongoing-risks-in-national-power-grid\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/murray.adv.br\/en\/brazil-blackout-reveals-ongoing-risks-in-national-power-grid\/#primaryimage","url":"https:\/\/s2-valorinternational.glbimg.com\/MErKSSTDLJArLlePutRMwLXbGFE=\/984x0\/smart\/filters:strip_icc()\/i.s3.glbimg.com\/v1\/AUTH_63b422c2caee4269b8b34177e8876b93\/internal_photos\/bs\/2025\/V\/F\/abXQWVSASgIP9ZS8AV3A\/foto15bra-101-apagao-a4.jpg","contentUrl":"https:\/\/s2-valorinternational.glbimg.com\/MErKSSTDLJArLlePutRMwLXbGFE=\/984x0\/smart\/filters:strip_icc()\/i.s3.glbimg.com\/v1\/AUTH_63b422c2caee4269b8b34177e8876b93\/internal_photos\/bs\/2025\/V\/F\/abXQWVSASgIP9ZS8AV3A\/foto15bra-101-apagao-a4.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/murray.adv.br\/en\/brazil-blackout-reveals-ongoing-risks-in-national-power-grid\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"In\u00edcio","item":"https:\/\/murray.adv.br\/en\/home\/"},{"@type":"ListItem","position":2,"name":"Brazil blackout reveals ongoing risks in national power grid"}]},{"@type":"WebSite","@id":"https:\/\/murray.adv.br\/en\/#website","url":"https:\/\/murray.adv.br\/en\/","name":"Murray Advogados","description":"PLG International Lawyers","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/murray.adv.br\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/murray.adv.br\/en\/#\/schema\/person\/dd0d0bea46c2436124555d18c1a0d52e","name":"Gelcy Bueno","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/murray.adv.br\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/1ef2acfe966d6deacdeccd2a24ea89192c41fd05fc60e57b79021358a47f5641?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/1ef2acfe966d6deacdeccd2a24ea89192c41fd05fc60e57b79021358a47f5641?s=96&d=mm&r=g","caption":"Gelcy Bueno"},"url":"https:\/\/murray.adv.br\/en\/author\/news\/"}]}},"_links":{"self":[{"href":"https:\/\/murray.adv.br\/en\/wp-json\/wp\/v2\/posts\/96297","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/murray.adv.br\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/murray.adv.br\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/murray.adv.br\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/murray.adv.br\/en\/wp-json\/wp\/v2\/comments?post=96297"}],"version-history":[{"count":2,"href":"https:\/\/murray.adv.br\/en\/wp-json\/wp\/v2\/posts\/96297\/revisions"}],"predecessor-version":[{"id":96299,"href":"https:\/\/murray.adv.br\/en\/wp-json\/wp\/v2\/posts\/96297\/revisions\/96299"}],"wp:attachment":[{"href":"https:\/\/murray.adv.br\/en\/wp-json\/wp\/v2\/media?parent=96297"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/murray.adv.br\/en\/wp-json\/wp\/v2\/categories?post=96297"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/murray.adv.br\/en\/wp-json\/wp\/v2\/tags?post=96297"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}